| Date | Topic | Short Description | Hours | Tags |
|---|---|---|---|---|
| 2025-04-03 | CAD Fuselage | CAD Model for bulkheads | 10 | cad, fuselage, cnc |
| 2025-04-15 | CAD Fuselage | Preparation of DXF files for fuselage bulkheads | 4 | cad, fuselage, cnc |
| 2025-04-30 | Application AESA | Writing documentation for the application. | 2 | aesa, documentation |
| 2025-05-01 | Application AESA | Writing documentation for the application. | 0.5 | aesa, documentation |
| 2025-05-06 | Application AESA | Writing documentation for the application. | 1.5 | aesa, documentation |
| 2025-05-11 | Application AESA | Renew certificates, writing documentation, SIPA | 2 | aesa, documentation |
| 2025-05-12 | CAD Fuselage | CAD model (DXF) for turtledeck “cintres” | 1.5 | fuselage, cad, cnc |
| 2025-05-14 | CAD Fuselage | CAD model (DXF) for turtledeck “cintres” | 0.5 | fuselage, cad, cnc |
| 2025-05-14 | Planning | Plywood planning | 0.5 | planning, plywood |
| 2025-05-17 | CAD Fuselage | DXF files for corners on CNC | 1 | cad, cnc |
| 2025-05-20 | Application AESA | Finishing AESA application | 1.5 | aesa, documentation |
| 2025-05-26 | CAD Fuselage | Cutlist plywood 2mm | 1.5 | fuselage, cad, plywood |
| 2025-05-27 | CAD Fuselage | Cutlist plywood 2mm | 1 | fuselage, cad, plywood |
| 2025-05-30 | CAD Fuselage | CAD model C8 | 1 | fuselage, cad |
| 2025-06-05 | Fuselage Bulkheads | Cut CNC parts | 3.5 | fuselage, cnc, bulkheads |
| 2025-06-07 | Fuselage Bulkheads | Sanding bulkhead corners | 2 | fuselage, bulkheads, sanding |
| 2025-06-11 | Firewall | PVC foam: planning, ordering, cutlist | 2 | firewall, pvc foam, cutlist, planning |
| 2025-06-12 | Blog | Research: what to use. Hugo, Zola, asciidoc | 3 | blog, documentation |
| 2025-06-15 | Blog | Ansible setup: firewall and basic caddy setup | 2 | blog, website, documentation |
| 2025-06-16 | Blog | Zola templates | 0.5 | blog, website, zola |
| 2025-06-16 | Epoxy research | selecting/researching epoxys (SR1500 vs 5550) | 1 | material, composites, expoxy |
| 2025-06-19 | Material sourcing | ordered carbon fiber at R-G (UD and twill) | 1 | material, composites, expoxy |
| 2025-06-20 | Empenage | CAD model for hotwire templates for vertical stabilizer | 3 | cad, empenage, hotwire |
| 2025-06-21 | Blog | Deploy to hetzner server | 2 | blog, website, zola, server, ansible |
| 2025-06-27 | Empenage Leading Edge | Preparint hotwire template (PLA print → aluminium) | 2 | leading edge, template, hotwire, empenage |
| 2025-06-28 | Blog | Write post (planning-plywood) | 0.5 | blog, website, writing |
| 2025-06-29 | Firewall | Sanding firewall | 0.5 | firewall, sanding, bulkheads, fuselage |
| 2025-06-29 | Firewall | tracing cutouts on PVC | 0.5 | firewall, pvc, fuselage |
| 2025-07-13 | Firewall | Sanding PVC foam inserts | 2 | firewall, pvc, fuselage |
| 2025-07-22 | Empenage Leading Edge | Hotwire cutting, sanding templates | 1.5 | empenage, hotwire |
| 2025-07-28 | General Preparation | Prepare cutlist oregon pine | 4 | |
| 2025-07-28 | General Preparation | cutting oregon pine | 4 | |
| 2025-08-11 | General Preparation | load tests oregon pine | 2 | |
| 2025-08-20 | General Preparation | load tests Okoume | 2 | |
| 2025-08-25 | General Preparation | preparation material for composite parts | 10 | composites, preparation, documentation |
| 2025-09-07 | Empenage | prep glass to laminate leding edge templates | 2 | empenage, composites |
| 2025-09-08 | Empenage | laminate templates for leading edge templates | 1.5 | |
| 2025-09-09 | Fuselage | fill firewall PVC foam with microsphere slurry | 1 | empenage, firewall, pvc |
| 2025-09-11 | Fuselage | trace firewall cutouts on plywood | 0.5 | fuselage, firewall |
| 2025-09-12 | Fuselage | sanding firewall, not finished with first side… | 4 | fuselage, firewall |
| 2025-09-13 | Fuselage | C10c, cut plywood pieces, glued layers | 0.5 | fuselage, firewall, C10c |
| 2025-09-29 | Empenage | Sanding leading edge template for horizontal stab. | 0.5 | empenage, horizontal, sanding |
| 2025-10-06 | Empenage | prepared template for horizontal stabilizer ribs Used provided A4 templates Transfer using acetone method | 0.5 | empenage, horizontal stabilizer |
| 2025-10-06 | Fuselage | continued sanding firewall PVC inserts | 1.5 | fuselage, firewall, sanding |
| 2025-10-08 | Fuselage Bulkheads | * planing 18x18 to strips to dimension | 2.5 | fuselage, bulkheads |
| 2025-10-08 | Fuselage Bulkheads | * glued C5 frame, incl. One side 2mm plywood | 0.75 | fuselage, bulkheads, C5 |
| 2025-10-09 | Firewall | * sealed PVC inserts with dry micro | 1 | fuselage, firewall |
| 2025-10-12 | Fuselage | * C1c | 1 | fuselage, bulkheads, C1c |
| 2025-10-12 | Firewall | * sanding PVC inserts | 1 | fuselage, firewall, sanding |
| 2025-10-12 | Empenage | apply pattern coat primer | 0.75 | empenage, leading edge, patterns, mold |
| 2025-10-12 | Firewall | * glued first side of firewall plywood | 0.75 | fuselage, firewall, fail |
| 2025-10-13 | Firewall | * apply micro-slurry on second side | 1.25 | fuselage, firewall |
| 2025-10-13 | Empenage | apply pattern coat primer | 1.25 | empenage, leading edge, patterns, mold |
| 2025-10-15 | Fuselage | cutted 18x18 strips to length for bulkheads | 0.75 | fuselage, bulkheads |
| 2025-10-15 | Fuselage | * glued parts of C1c * varnished C5 | 1.5 | fuselage, bulkheads, C1c, C5 |
| 2025-10-17 | Fuselage | prepared 18x18 and 18x9 strips for bulkheads | 1 | fuselage, bulkheads |
| 2025-10-18 | Fuselage | * glued C2, C3 corners | 1.5 | fuselage, bulkheads, C2, C3 |
| 2025-10-18 | Fuselage | glued C1c frame | 0.5 | fuselage, bulkheads, C1c |
| 2025-10-19 | Fuselage | prepared diagonal strips | 2 | fuselage, bulkheads, C1c, C2, C3 |
| 2025-10-20 | Firewall | planed to 16mm thickness. | 2 | fuselage, firewall |
| 2025-10-21 | Firewall | sealed firewall PVC with micro slurry | 1 | fuselage, firewall |
| 2025-10-21 | Fuselage | cut and planed 18x18 sticks | 0.5 | fuselage, bulkheads, C2, C3, C4 |
| 2025-10-22 | Fuselage | cut C2, C3, C4 plywood skins | 1 | fuselage, bulkheads, C2, C3, C4 |
| 2025-10-22 | Fuselage | glued C2, C3 diags, wedges and attachment blocks | 1.5 | fuselage, bulkheads, C2, C3 |
| 2025-10-22 | Fuselage | glued C4 | 1.5 | fuselage, bulkheads, C4 |
| 2025-10-22 | Fuselage | building temperbox for curing bulkheads | 0.5 | fuselage, bulkheads |
| 2025-10-25 | Fuselage | * sanding C3 * Q.C. of C1-C5 | 0.5 | fuselage, bulkheads |
| 2025-10-25 | Fuselage | cut C1c plywood skins | 0.5 | fuselage, bulkheads |
| 2025-10-26 | Fuselage | cutting plywood skins | 1.5 | fuselage, bulkheads |
| 2025-10-29 | Fuselage | cut rest of C1-C5 plywood skins | 0.5 | fuselage, bulkheads |
| 2025-10-29 | Fuselage | prepare (plane) sticks for C6 | 0.5 | fuselage, bulkheads, C6 |
| 2025-10-30 | Fuselage | glue fwd skin of C3 | 0.5 | fuselage, bulkheads, C3 |
| 2025-10-30 | Fuselage | glue aft skind of C3 | 2 | fuselage, bulkheads, C3 |
| 2025-10-31 | Fuselage | monitoring post curation | 0.5 | fuselage, bulkheads, curing |
| 2025-11-02 | Fuselage | change temperbox setup | 1.5 | workshop, temperbox |
| 2025-11-02 | Fuselage | prepared C6 top stick, 914m, with relief cuts | 1 | fuselage, bulkheads, C6 |
| 2025-11-03 | Fuselage | C1c plywood skin | 2 | fuselage, bulkheads, C1c |
| 2025-11-04 | Fuselage | C5 prep for glueing | 2 | fuselage, bulkheads, C5 |
| 2025-11-05 | Fuselage | planed 18x18 sticks for C1-C6 | 1.5 | fuselage, bulkheads, C1, C2, C3, C4, C5, C6 |
| 2025-11-05 | Fuselage | firewall plywood skins glued: 2nd attempt | 2 | fuselage, firewall |
| 2025-11-06 | Fuselage | sanding C2, C4, C5 frames | 1 | fuselage, C2, C4, C5 |
| 2025-11-09 | Fuselage | glued plywood skins C2, C4, C5 | 2 | fuselage, C2, C4, C5 |
| 2025-11-09 | Fuselage | cut C6 sticks to size | 1 | fuselage, C6 |
| 2025-11-11 | Fuselage | C2 second plywood skin | 0.5 | fuselage, C2 |
| 2025-11-11 | Fuselage | C10, arc cutted | 1 | fuselage, C10 |
| 2025-11-14 | Composites | driving to pick up molds | 6 | composites, travel |
| 2025-11-15 | Composites | prepared workship, started with seats | 6.5 | composites, seat, infusion |
| 2025-11-15 | Composites | continued seat | 1 | composites, seat, infusion |
| 2025-11-15 | Composites | Cut plies for spinner base and air intake | 2.5 | composites, spinner, air intake |
| 2025-11-16 | Composites | air ducts prep | 3 | composites, airducts |
| 2025-11-22 | Composites | gaines d’aire | 2.5 | composites, airducts |
| 2025-11-22 | Composites | exhaust fairing, horizontal stabilizer fairing | 1 | composites, exhaust fairing |
| 2025-11-22 | Composites | vertical stabilizer fairing | 1 | composites, vertical stabilizer fairing |
| 2025-11-22 | Composites | gaines d’aire | 1 | composites, airducts |
| 2025-11-22 | Composites | preparing spinner | 1 | composites, spinner |
| 2025-11-23 | Composites | prepare wheel pants | 2 | composites, wheel pants |
| 2025-11-23 | Composites | seat supports laminated | 2 | composites, seat |
| 2025-11-23 | Composites | prepared lower part of engine cowling | 3.5 | composites, cowling, infusion |
| 2025-11-24 | Composites | cut plies for seat | 0.5 | composites, seat |
| 2025-11-24 | Composites | infusion of lower engine cowling | 2 | composites, cowling, infusion |
| 2025-11-25 | Composites | prepare upper part of engine cowling | 3.5 | composites, cowling, infusion |
| 2025-11-27 | Composites | infusion of upper engine cowling | 4.5 | composites, cowling, infusion |
| 2025-11-27 | Composites | demolding lower part of engine cowling | 1.5 | composites, cowling, demolding |
| 2025-11-28 | Composites | vertical stabilizer fairing, upper radiator shroud prep | 1.5 | composites, fairing |
| 2025-11-28 | Composites | joined wheel pant, vertical stab. Top part laminated | 1.5 | composites, wheel pants, fairing |
| 2025-11-29 | Composites | demolded wheel pants | 1.5 | composites, wheel pants |
| 2025-11-29 | Composites | laminated second wheel pant | 1 | composites, wheel pants |
| 2025-11-29 | Composites | laminated tail cone | 3 | composites, tail cone |
| 2025-11-30 | Composites | wing fairing, cowling corners, spinner | 8.5 | composites, fairing, spinner |
| 2025-12-01 | Composites | demolded upper cowling part | 1.5 | composites, cowling, |
| 2025-12-01 | Composites | demolded wheel pants | 0.5 | composites, wheel pants |
| 2025-12-01 | Composites | joined wheel pant, laminated fuel sump | 1 | composites, wheel pants, fuel sump |
| 2025-12-02 | Composites | prepared xps strips for cowling | 2 | composites, cowling |
| 2025-12-03 | Composites | laminated xps strips for cowling | 3 | composites, cowling |
| 2025-12-04 | Composites | demolded seats and airducts | 2 | composites, seat, airduct, demolding |
| 2025-12-05 | Composites | prepare second seat (2nd attempt) for infusion | 6 | composites, seat, infusion |
| 2025-12-06 | Composites | infused second seat | 3.5 | composites, seat, infusion |
| 2025-12-07 | Composites | demolded second seat | 2.5 | composites, seat, demolding |
| 2025-12-08 | Composites | preparing landing gear mold | 1.5 | composites, landing gear |
| 2025-12-09 | Composites | preparing and repairing landing gear mold | 14 | composites, landing gear |
| 2025-12-11 | Composites | preparing landing gear mold | 2 | composites, landing gear |
| 2025-12-11 | Composites | preparing 2nd attempt of first seat | 3.5 | composites, seat |
| 2025-12-12 | Composites | preparing landing gear lamination | 1 | composites, landing gear |
| 2025-12-13 | Composites | landing gear (1st attempt) | 15.5 | composites, landing gear |
| 2025-12-26 | Composites | seat 2nd attempt | 4.5 | composites, seat |
| 2025-12-31 | Composites | prepared improved steel strips for landing gear | 3 | composites, landing gear |
| 2026-01-02 | Composites | landing gear (2nd attempt) | 19.5 | composites, landing gear |
| 2026-01-06 | Composites | demolded seat and landing gear | 2 | composites, landing gear, seat |
| 2026-01-07 | Composites | cleaned landing gear mold | 4 | composites, landing gear |
| 2026-01-09 | Composites | sanding landing gear | 1.5 | composites, landing gear, sanding |
| 2026-01-14 | Composites | sanding landing gear | 2 | composites, landing gear, sanding |
| 2026-01-18 | Composites | sanding landing gear | 1 | composites, landing gear, sanding |
| 2026-01-18 | Composites | kevlar and carbon wrapping | 1.5 | composites, landing gear, kevlar |
| 2026-01-21 | Composites | laminated kevlar and carbon sock | 1.5 | composites, landing gear |
| 2026-03-05 | Fuselage | prepared 18x12 | 0.5 | fuselage, bulkheads, C6 |
| 2026-03-05 | Fuselage | prepared plywood pieces C7, C8, C9 | 1 | fuselage, bulkheads, C7, C8, C9 |
| 2026-03-08 | Fuselage | cutted plywood pieces C7, C8, C9 | 1 | fuselage, bulkheads, C7, C8, C9 |
| 2026-03-08 | Empenage | raw cutting of horizontal stabilizer spars | 1 | empenage, horizontal, spar |
| 2026-03-08 | Empenage | planed horizontal stabilizer spars | 0.5 | empenage, horizontal, spar, planing |
| 2026-03-08 | Fuselage | verifying, controlling & adjusting C7, C8 | 0.5 | fuselage, bulkheads, C7, C8 |
| 2026-03-11 | Fuselage | C6 (2nd attempt), C7, C8, C9 glued | 3.5 | fuselage, bulkheads, C6, C7, C8, C9 |
| 2026-03-13 | Fuselage | first scarf joint of 30x10 stringers | 1 | fuselage, longerons, 30x10 |
| 2026-03-13 | Fuselage | glued reinforcements C7, C8 | 0.5 | fuselage, bulkheads, C7, C8 |
| 2026-03-14 | Fuselage | planed strips to 10.2mm thickness | 0.5 | fuselage, longerons, 30x10 |
| 2026-03-14 | Fuselage | scarf jointing 30x10 longeron strips #2, #3 | 1 | fuselage, longerons, 30x10 |
| 2026-03-14 | Fuselage | glued C6, C7, C9 reinforcements | 0.5 | fuselage, bulkheads, C6, C7, C9 |
| 2026-03-17 | Fuselage | scarf jointing 30x10 longeron strips #4, #5 | 1 | fuselage, longerons, 30x10 |
| 2026-03-18 | Fuselage | scarf jointing 30x10 longeron strips #6 | 1 | fuselage, longerons, 30x10 |
| 2026-03-22 | Fuselage | scarf jointing 30x10 longeron strips #6 (2nd) | 0.5 | fuselage, longerons, 30x10 |
| 2026-03-22 | Fuselage | inspecting 18x9 strips | 0.5 | fuselage, longerons, 18x9 |
| 2026-03-26 | Fuselage | scarf jointing 18x9 longeron strips #1, #2 | 1.5 | fuselage, scarf, 18x9 |
| 2026-03-27 | Workshop | Prepared feets for fuselage table. Cut, sand, clean, weld | 1.5 | workshop, table |
| 2026-03-28 | Workshop | preparing strongback | 1.5 | workshop, table, strongback |
| 2026-03-29 | Workshop | strongback | 2.5 | workshop, table, welding |
| 2026-04-01 | Documentation | updating timelog from workshop logbook | 1 | timelog, documentation |
| 2026-04-05 | Documentation | updating timelog from workshop logbook | 0.5 | timelog, documentation |
| 2026-04-08 | Fuselage | planed 30x10 strips to 30.1mm | 0.5 | workshop, fuselage |
| 2026-04-08 | Fuselage | trimmed edges of C6-C9 bulkheads with router | 0.5 | fuselage, C6, C7, C8, C9, bulkheads |
| 2026-04-08 | Fuselage | mounted lateral wood beams on strongback | 3.5 | fuselage, strongback, workshop |
Timelog
2026-03-08